Skip to main content

Posts

Upstairs hall bath progress pics

I swear this color is a pale aqua that is coming across very poorly in this light. Everything else in the room will be white and chrome (with black accents in the white tile). We only need to install tile, trim, sink, toilet, tub (after cleaning/reglazing), mirror, shelves, and this will be a working bathroom. Oh yeah, and a door. Talk to me again in a month. :)

Master bedroom - progress so far

This room made it to primer this weekend, woohoo! We filled a 15 cubic yard dumpster demo'ing this room and a 5x8 bathroom. For those of you who are challenged, spacial-relations wise, like me, that is a big dumpster. The pile of junk in the second picture here is just a fraction of that. After many trips up and down the stairs to the dumpster, we were able to re-insulate the room and re-frame one wall. The new wall is on the left side when you walk in the room, not shown here. We put the wall back to its original location (as we can tell by remaining studs and the floor) by removing the closet in this room and the room behind it. That freed up over 2 extra feet of width in this room (now ~14x14). We're turning a nearby storage area into a walk-in closet and that adjacent bedroom into the master bath (bath part happening approx. 1 million days in the future), so losing those closets is OK. After that, we were finally at the drywall stage. Props to Steve for drywalling help! Dr...

What we've been up to lately

I've been much delayed posting all these pics of finished rooms. The two bedrooms were complete at the beginning of January, the living room in late January. Since then, we went back to demolition - upstairs bathroom and master bedroom. After a week of demo, some rough-in work, insulation, and a long weekend away on vacation, we're now getting the master bedroom ready to paint. The super exciting task of mudding and sanding the new drywall will hopefully be complete by the end of the weekend, after which we can start the drywall process all over again in the bathroom. In between, we've been meeting with various contractors about the floors and HVAC. Floors will be done in mid-March. We're scheduled to close on our current house at the very end of March, then will live in the construction zone. :) Pics of in process rooms to come soon(ish)...

Living room - after

Taken with different cameras at different times of day - color is more like the top pics than the baby blue on the bottom. This room is done! Well, almost done. Still need to replace some missing and broken tiles on the fireplace (that's currently blue painter's tape you see in the pic), and refinish the floors. All the floors in the house are being refinished in a few weeks - can't wait! Ceilings in this room (like all first floor) are around 9 1/2'.

Living room - before

This is the living room, despite the bed. Lovely paneling on the walls and ceiling, and even on the fireplace!!

On blogging

I would not recommend Blogger.com, sadly. This thing crashes every time I try to post pictures - arg! I swear we would be more frequent posters were it not for the crashing...

Bedroom 2 before and after

No more dark paneling, dirty mauve shag carpet, log cabin-worthy trim, or acoustic tiles stapled to the ceiling. No more opening the door and walking smack into a shelving unit. This room will be our temporary bedroom until the master bedroom is done (hopefully not too long!). After that, it will be a guest bedroom. PS - When I was taking these after pics, I did not realize that the camera was as dusty as the rest of the house, so please ignore the white spots. That will continue for several more posts. :)

Bedroom 2 is for the birds

Literally. We found 2 bird nests in the walls. I'm not into theme decorating, but this room might a subtle bird theme.

Bedroom 1 - the finale

This room was actually finished several weeks ago. Many thanks to Bill's mom Nancy and his sister Mary for all their help on this room and the second bedroom!! Floor refinishing and some furniture is all this guest room needs.

Bedroom 1 - the process

Remove carpet and pad Remove particle board over floor Remove trim Remove paneling Remove sheathing under paneling Remove million nails left in walls Remove light fixture Remove ceiling tiles Remove million staples left in ceiling Remove old closet Remove insulation Frame new closet Move outlets from waist-high to normal height Spray insulate everywhere light comes through the exterior walls Rehang windows where ropes to weights had broken Insulate walls Drywall ceiling Drywall walls Mud, sand, repeat ad infinitum Cough up a lung from inhaling dust from sanding Prime Mud, sand seams that still show Paint Damn! Mud, sand a few more Re-prime Re-paint Re-hang door so it's not 3 inches above the floor Trim doors Trim windows Apply baseboards Apply crown Nail set 1,000 nails in the trim Putty nail holes Prime trim Paint trim Caulk Hang new ceiling fan Paint closet doors Hang closet doors Hang closet shelves/rod